    A helpful tip here: if the top soil is of good quality, remove it with a bulldozer for later use in landscaping. Site excavation and earthwork. There are two types of excavation. The first one is called bulk excavation. This is excavation that clears a level area for the building. The second type of excavation is called detailed or footing

    Learn More
  • Backfilling Trenches and Other Excavations

    May 07, 2021 · Soil is typically backfilled in layers or lifts. The soil lift will depend upon the nature of the backfill and the compaction equipment that is used. Water may be added during the compaction process, to assist with compaction. The general process follows three …

    Learn More
  • Trenching and Excavation Safety

    Certain conditions preclude soil from being classified as Type A. For example, no soil is Type A if it is fissured or has been previously disturbed. See Appendix A to Subpart P of Part 1926, paragraph (b) – Definitions (Type A), for a detailed definition of Type A soil. Type B – Includes cohesive soil with an unconfined compressive

    Learn More
  • Study of Forces Acting on Excavator Bucket While Digging

    Study of Forces Acting on Excavator Bucket While Digging

    Learn More
  • Pond Excavation Basics | Can You Dig It? - POND Trade Magazine

    Mar 01, 2017 · Clay Soil: Spring and fall are the best times for excavation because the clay is softer. Midsummer requires a pick-ax to chisel through the hardened clay. Clay soil in certain areas is notoriously bad, so the selling price of the job should reflect the extra time needed to complete the excavation if the soil causes difficulties.

    Learn More
  • Excavation, Backfill & Compaction within the Swamp Area

    ( SOIL IMPROVEMENT ) Contents Page 1. Purposes 2. Scope of Works 3. Safety 4. Work Method 1.1 Preparation of the Works 1.2 Main Tools & Equipment 1.3 Survey 1.4 Dewatering 1.5 Excavation 1.5.1 Excavation Criteria 1.5.2 Excavation, Backfill & Compaction Procedure 5. Job Safety Analysis 6. Emergency Plan Flow Chart 2 2 2 4 4 4 4 5 5 5 9 13 17

    Learn More
  • 5 Steps For Excavation Site Preparation | G&B Construction

    Mar 27, 2019 · Here are the major steps for excavation site work. Site Surveying: A surveyor will come out to the site to make sure it is in the right location and within the parameters and boundaries that the site is supposed to be within. They'll place markers around the site to ensure the developers know the perimeter. Site Clearing: Before a site can be

    Learn More
  • The Methodologies for collecting sediment samples - Van

    Sep 24, 2014 · September 24, 2014. To collect sediment samples there are several methodologies that can be used depending on your site and type of sediment. Methodologies: Standard Surface Grab Collection with Scoops and Grabs. Scoops and spoons are inexpensive, widely available, non-mechanical, very portable, able to sample nearly every sediment type and

    Learn More
  • Trenching and Excavation - Construction | Occupational

    OSHA 3015, Excavation, Trenching and Soli Mechanics. This course covers the OSHA Excavation Standard and safety and health aspects of excavation and trenching. Course topics include practical soil mechanics and its relationship to the stability of shored and unshored slopes and walls of excavations, introduction of various types of shoring

    Learn More
  • Method Statement for Site Clearance Grubbing and …

    EXCAVATION and BASEMENT CONSTRUCTION Introduction

    Learn More
  • Trenching and Excavation Procedures and Safety

    Aug 24, 2020 · Depending on the soil, you'll use one of the following ways to secure the site. Sloping involves slanting the soil away from the trench. This is done by cutting back the trench wall at an angle that's inclined away from the excavation. Trench slope design is a key factor in longevity.

    Learn More
  • Excavator Sizes: Which One to Choose for Your Project

    Jun 12, 2019 · Choosing the right equipment for a digging project can be a time-consuming task, especially since it's so important to make the right choice. Even once you've decided on using an excavator, you still need to make sure you choose the right size. Pick one that's too small or doesn't have the right functionality and you won't be able to get the job done properly.

    Learn More
  • Chapter 2 Earthwork

    For easy excavating of tool into soil it's necessary that the digging force offered by tool must be greater than the resistive force offered by soil. Design of excavator bucket is a challenging work because it's a first part which comes in contact with soil. Various forces are acting on the bucket which resists the motion of bucket into the

    Learn More
  • Excavator - Wikipedia

    Modern hydraulic excavators come in a wide variety of sizes. The smaller ones are called mini or compact excavators. For example, Caterpillar's smallest mini-excavator weighs 2,060 pounds (930 kg) and has 13 hp; their largest model is the largest excavator available (developed and produced by the Orenstein & Koppel, Germany, until the takeover 2011 by Caterpillar, named »RH400«), the CAT

    Learn More
  • Soil Sample Collection and Analysis Procedures

    2. When sampling excavation sidewalls or floors, r emove at least one foot of exposed soil prior to collecting the sample to ensure collection of a fresh sample. See . Excavation of petroleum contaminated soil. for sampling requirements. 3. Collect samples from split-spoon samplers or soil sample liners using a procedure that will minimize losses

    Learn More
  • Excavation and Backfilling of Soil - Work Sequence and

    Excavation and backfilling of soil is a very important part of construction process, and care must be taken while excavation in safety perspective. Different soil layers may be encountered while excavation, dewatering may be needed sometimes. These points must be kept in mind to take necessary action during excavation and backfilling.

    Learn More
  • Method Statement For Sheet Piling | Sheet Piles

    Aug 04, 2020 · Vibratory Excavator Method Statement of Sheet Piling. Due to unpredictable soil conditions on-site, the contractor may face difficulties in using the silent piler method. It could vary soil profiles at certain locations which impose higher resistance to driving stresses and thus limit the usage of the silent piler method.

    Learn More
  • Soil Sampling - US EPA

    Proceed to step 4. 2. If sub-sampling the primary sample in the field or compositing multiple primary samples in the field, place the sample into a glass or stainless steel be collected as close to the sampled area as possible and from the same soil type. Equipment blanks should be collected if equipment is field cleaned and re-used on-site or

    Learn More
  • 1301:Liming Sampling and analysis of excavated soil for

    (6) All soil samples collected for the purposes of this rule shall be discrete grab samples. Composite soil samples shall not be used for the purposes of complying with this rule. All excavated soil shall be sampled within forty-eight hours of the completion of the excavation. (7) Grab samples shall be split into two components.

    Learn More
  • Understanding and interpreting soils and soil boring

    Jun 15, 2021 · 1 an additional soil boring or pit should be completed for each additional 2,500 ft 2 above 12,500 ft 2 2 an additional five permeameter tests should be completed for each additional 5,000 ft 2 above 15,000 ft 2. Historical site information. Prior to ordering a soil investigation, it is highly recommended that historical records are evaluated for the site.

    Learn More